We redid our entry way. I took down the trim, we leveled the wall,applied texture and painted. I need to replace the light fixture. I'm happy with how it looks.
This is before
This is before texture/painting
We have been replacing the doors on the closets.
We have been working on the bedroom downstairs. We painted, did the trim around the window, and replaced the light fixture.We put doors on the room where the furnace/AC fan/water softener is
The doors that were on there were broken,we're like that when we moved in.
The picture below was when I was still painting....
The tree stump above, I am hoping to burn with briquettes. We want to put a walking path along the driveway. That stump was from a river birch, so there are several trunks. We put stump rot in the beginning of March. I am hoping it will be gone by July.