Friday, May 26, 2017

Bathroom remodel

Our bathroom downstairs was gross. I could never get the shower stall "clean", it leaked like a sieve. The floor had numerous water stain. The glass shower doors leaked.
Hubby tore it down to the studs. 
We are finally getting around to putting it back together.




Hubby put down the mortar that the tub liner will sit on top of. Hopefully by tomorrow afternoon it will be set, so we can move on to the next step.

No comments:

Post a Comment